RT journal article T1 Comparison of the Stability and Accuracy of Deterministic Project Cost Prediction Methods in Earned Value Management A1 Barrientos Orellana, Alexis A1 Ballesteros Pérez, Pablo A1 Mora Melià, Daniel A1 Cerezo Narváez, Alberto A1 Gutiérrez Bahamondes, Jimmy H. A2 Ingeniería Mecánica y Diseño Industrial K1 accuracy K1 cost prediction methods K1 earned value analysis K1 stability K1 topological structure AB Completing a project on time and on budget are essential factors for the success of any project. One technique that allows predicting the final cost of a project is earned value management (EVM). In this technique, different mathematical methods for predicting the final project cost have been proposed over the last 30 years. These formulas make use of activities’ actual costs and durations as the project progresses. EVM is a technique widely used by many project management professionals. However, very few studies have compared the stability and accuracy of the multiple existing methods for predicting the final cost of the project (commonly abbreviated as estimated cost at completion, EAC). This study compares the stability and accuracy of 30 deterministic cost prediction methods (EAC) in EVM. For this purpose, a representative database of 4100 simulated projects of various topological structures is used. Our results suggest that the methods with the simplest mathematical configurations achieve better stability and accuracy performance. Knowing which EVM methods are the most stable and accurate for predicting the final cost of the project will help project practitioners choose the most reliable cost prediction techniques when they are managing their own projects in real contexts. PB MDPI SN 2352–4847 YR 2023 FD 2023-05-02 LK http://hdl.handle.net/10498/29944 UL http://hdl.handle.net/10498/29944 LA eng DS Repositorio Institucional de la Universidad de Cádiz RD 07-nov-2026