Mostrar el registro sencillo del ítem

dc.contributor.authorBallesteros Pérez, Pablo 
dc.contributor.authorCerezo Narváez, Alberto 
dc.contributor.authorOtero Mateo, Manuel 
dc.contributor.authorPastor Fernández, Andrés 
dc.contributor.authorZhang, Jingxiao
dc.contributor.authorVanhoucke, Mario
dc.contributor.otherIngeniería Mecánica y Diseño Industriales_ES
dc.date.accessioned2020-05-13T09:30:26Z
dc.date.available2020-05-13T09:30:26Z
dc.date.issued2020-01
dc.identifier.issn2076-3417
dc.identifier.urihttp://hdl.handle.net/10498/22971
dc.description.abstractMost construction managers use deterministic scheduling techniques to plan construction projects and estimate their duration. However, deterministic techniques are known to underestimate the project duration. Alternative methods, such as Stochastic Network Analysis, have rarely been adopted in practical contexts as they are commonly computer-intensive, require extensive historical information, have limited contextual/local validity and/or require skills most practitioners have not been trained for. In this paper, we propose some mathematical expressions to approximate the average and the standard deviation of a project duration from basic deterministic schedule information. The expressions’ performance is successfully tested in a 4100-network dataset with varied activity durations and activity durations variability. Calculations are quite straightforward and can be implemented manually. Furthermore, unlike the Project Evaluation and Review Technique (PERT), they allow drawing inferences about the probability of project duration in the presence of several critical and subcritical paths with minimal additional calculation.es_ES
dc.formatapplication/pdfes_ES
dc.language.isoenges_ES
dc.publisherMDPIes_ES
dc.rightsAtribución 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/*
dc.sourceAppl. Sci. 2020, 10(2), 654es_ES
dc.subjectproject durationes_ES
dc.subjectschedulinges_ES
dc.subjectmerge event biases_ES
dc.subjectconstructiones_ES
dc.subjectPERTes_ES
dc.titleForecasting the Project Duration Average and Standard Deviation from Deterministic Schedule Informationes_ES
dc.typejournal articlees_ES
dc.rights.accessRightsopen accesses_ES
dc.identifier.doi10.3390/app10020654


Ficheros en el ítem

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Atribución 4.0 Internacional
Esta obra está bajo una Licencia Creative Commons Atribución 4.0 Internacional